|
Pour the dry mix on to the flat bed and, using a straight edge, smooth it out until it is level with the rest of the
paving. Then remove a small quantity
of the mix from the centre so that it does not overflow as you work. This
extracted mix can be put back at a later stage as required, as the design begins
to take shape.
|